So over the span of an hour I pulled up all of the tile and cleaned up the area. We decided to put down tumbled stone 2x2 tiles. They came in a 1 sq. foot section held together by mesh - a pretty neat solution.
It took me 5 -6 hours to lay out and cut the tile as needed. Luckily the tile is very soft and I was able to use my hacksaw to make the cuts I needed.
I then used the tile cement and laid them down. Since they are porous tiles I will have to seal them first before we grout them. It will take 3 coats of sealant and then a day of drying. We have chosen a grout color called "Bone" which should nicely match the tiles.
I always have a hard time with drastic change so it will take me a bit to get used to these but I overall like how they look and I think once they are grouted they will look even better.